SAP SYSTEM COPY - in a nutshell
Several advantages at once
Renaming and restoring the target system database - adjusting file system permissions. Renaming, recovery and startup of the target system database.

A system copy can be created either with SAP transactions (R3trans, from R4.6C SAPinst) or at file and database level. Costs and effort increase with the size of the system and the requirements for availability and data protection. In addition, administrative rework is often necessary, starting with the system name and extending to printers and interfaces.
Possibility of manual intervention in case of delta import
Unicode conversion: During the copy, the system is converted from non-Unicode to Unicode. This happens in the context of a homogeneous or heterogeneous system copy. In connection with Unicode must be differentiated between the system copy of a Unicode system and the Unicode conversion.

Packages that have not been explicitly assigned a special DDLORA file receive the DDL file specified via the "ddlFile=" parameter. The default is DDLORA.TPL.

"Shortcut for SAP Systems" can considerably simplify and shorten a number of activities within the scope of a system copy or a system refresh. By using this application in conjunction with the information on system-specific tables from the PCA tool, the system-specific data can be backed up and restored after the system copy / system refresh. As a result, many of the activities mentioned here regarding data backup / restore can be performed much more easily; the creation of screenshots and the subsequent manual restoration of the state documented in this way can then be completely eliminated.

SAP® landscapes include not only production but also Quality Assurance (QA) systems as well as test and other staging systems.

SAP Basis is the foundation of any SAP system. You can find a lot of useful information about it on this page: www.sap-corner.de.


Although the actual copying process is completed in just a few hours, the manual post-processing - which includes, for example, adjusting parameters, users and rights, profiles, system settings and interfaces - can take up to a week.